FluidStack vs Voltage Park: Pricing, Specs, Strengths & Weaknesses
Side-by-side comparison of GPU compute pricing, regions, billing models, and strengths for FluidStack and Voltage Park. Rates sourced from public APIs — verify current availability and billing terms before purchasing.
Overview
Strengths & Best For
FluidStack has pivoted from a GPU cloud aggregator to a vertically-integrated AI infrastructure builder with a mission to ensure democracy wins the AI race. The company is building hundreds of gigawatts of solar-powered compute, constructing 250 MW data centers in six months from breaking ground, and onshoring manufacturing for compute and power infrastructure. Closed-loop cooling (water recirculates indefinitely), millions invested in local communities, and off-grid solar development. No public GPU pricing page — contact for enterprise capacity.
- Vertically-integrated AI infrastructure at gigawatt scale
- Closed-loop cooling — water recirculates indefinitely
- Off-grid solar development for sustainable compute
- 250 MW data centers built in 6 months from breaking ground
- Onshored manufacturing for compute and power infrastructure
- No self-serve on-demand pricing — enterprise contracts only
- Pivoted away from consumer/SMB GPU cloud
- Limited public information on current GPU catalog and pricing
No reviews yet — add yours ↗
Voltage Park has merged with Lightning AI to create one place to build and ship AI. The combined platform offers 36,000 NVIDIA Hopper, Blackwell, and Grace Blackwell GPUs across 8,176-GPU InfiniBand clusters with 3,200 Gbps aggregate bandwidth (NVIDIA Quantum-2 InfiniBand). On-demand H100 available with no long-term contracts; reserved/long-term pricing available. Dell PowerEdge XE9680 servers with NVIDIA HGX H100s, 1TB RAM SXM, 52 vCPUs. Tier 3+ data centers. AI Factory products include GraphN, image/video/podcast generators, and model playground. Customers include Cursor, Caltech, Phind, Dream3D, Prime Intellect.
- On-demand H100 with no long-term contracts
- 36,000 Hopper/Blackwell/Grace Blackwell GPUs
- 8,176-GPU InfiniBand clusters, 3,200 Gbps bandwidth
- Merged with Lightning AI — AI Factory + GPU Cloud combined
- Tier 3+ data centers
- Trusted by Cursor, Caltech, Phind, Prime Intellect
- Merger with Lightning AI creates product transition period
- Primarily H100 Hopper — Blackwell availability limited
- Fewer self-service features vs RunPod or Vast.ai
No reviews yet — add yours ↗
Live GPU Pricing
Green = lower price. On-demand hourly rates. Updated every 15 minutes.
Region Coverage
Popular Comparisons
Provider pages
More FluidStack comparisons
Key differences
FluidStack
Building compute faster than anyone — hundreds of GW solar, 250 MW data centers in 6 months
Voltage Park
Merged with Lightning AI — H100 on-demand, 36,000 Hopper/Blackwell/Grace Blackwell GPUs